Hiring a builder can feel confusing because there is rarely one simple price.
Some builders charge by the hour. Others use a day rate. Larger projects such as extensions, structural alterations and renovations are more likely to be quoted as a complete job.
So, how much does a builder charge per day in the UK in 2026?
A realistic current figure for a general builder is around £200–£400 per day, with approximately £400 per day appearing as a current national benchmark for an experienced general builder. MyBuilder’s 2026 guide gives a broad general-builder range of around £150–£400 per day, while Checkatrade currently uses approximately £400 per day as its headline average.
For smaller jobs, builders may instead charge approximately £25–£60 per hour, with experienced builders on more demanding work commonly around £40–£50 per hour.
As a practical 2026 guide:
| Trade | Typical UK day rate |
|---|---|
| General builder | £200–£400 |
| Bricklayer | £240–£320 |
| Labourer | £112–£280+ |
| Carpenter | £240–£360 |
| Plasterer | £250–£350 |
| Roofer | £280–£360 |
| Electrician | £300–£480 |
| Plumber | £320–£480 |
| Scaffolder | £280–£320 |
These figures are useful for budgeting, but a builder’s day rate is not the same thing as the total cost of your building project.
Materials, waste removal, scaffolding, specialist subcontractors, structural engineering, equipment hire and VAT where applicable can all sit outside the basic labour rate.
That distinction matters enormously.
A builder quoting £300 per day may ultimately produce a more expensive project than someone charging £380 if the first works more slowly, adds numerous extras or has not included the same scope.
What Does a Builder’s Day Rate Actually Mean?
A day rate is simply the amount charged for a day’s labour.
For example:
Builder day rate: £350
If the builder works for five days:
£350 × 5 = £1,750 labour
But that £1,750 may not include:
- bricks;
- timber;
- plasterboard;
- cement;
- skips;
- scaffolding;
- plant hire;
- electricians;
- plumbers;
- structural engineers;
- building-control fees.
MyBuilder specifically notes that a day rate is typically a labour-only charge, with materials, waste and specialist trades priced separately unless the agreement says otherwise.
This is why you should never assume that:
“£350 per day for two weeks”
means the entire project will cost £3,500.
Ask exactly what the daily rate covers.
How Much Does a General Builder Charge Per Day?
For a general builder, around £200–£400 per day is a sensible current UK range.
Checkatrade’s April 2026 guide uses approximately £400 per day as the average national figure, while MyBuilder puts general builders around £150–£400 per day depending on experience, location and type of work.
A builder near the lower end may be carrying out relatively straightforward work or operating in a lower-cost region.
A builder towards £350–£400+ may be:
- highly experienced;
- handling structural work;
- coordinating several trades;
- working in London or the South East;
- taking on more complicated projects;
- running a larger construction business with higher overheads.
The important thing is to compare competence and scope, not merely the rate.
How Much Does a Self-Employed Builder Charge?
Self-employed builders can sometimes charge less than larger building companies because they have fewer organisational overheads.
Checkatrade’s current 2026 guide puts a typical self-employed builder around £40 per hour.
For an eight-hour working day, that would theoretically equal:
£40 × 8 = £320
However, not every builder calculates their day rate by simply multiplying an hourly rate by eight.
Day rates can account for:
- travel;
- setup;
- tool use;
- insurance;
- non-billable administration;
- site responsibility.
That is why asking:
“What is your full day rate?”
is more useful than trying to reverse-engineer it from an hourly price.
How Much Does a Builder Charge Per Hour?
Current UK guidance puts general builder hourly rates roughly around £25–£60 per hour, with Checkatrade suggesting around £50 per hour for an experienced builder handling more demanding work.
Hourly charging tends to make more sense for:
- minor repairs;
- short jobs;
- patching;
- small sections of brickwork;
- simple alterations.
Builders often apply a minimum charge.
MyBuilder notes that a small one-hour job can still be billed as two to four hours once travel and setup are taken into account.
That means a builder charging £45 per hour might quote:
minimum 3 hours = £135
even if the physical repair itself takes only 90 minutes.
That is not automatically unreasonable.
Travelling to a property, unloading tools and losing the opportunity to schedule another larger job all have commercial value.
Day Rate vs Fixed Quote: Which Is Better?
Neither is automatically better.
They simply allocate risk differently.
Day rate
You pay according to the number of days the builder works.
This can make sense for:
- exploratory repair work;
- older properties;
- jobs where hidden defects are likely;
- work where the scope may change.
The advantage is flexibility.
The disadvantage is that you do not know the exact final labour cost until the work is complete.
Fixed quote
The builder agrees a price for a defined scope.
For example:
Remove wall, install steel beam, make good plasterwork: £6,500
The builder now carries more risk if the job takes longer than expected, provided the scope genuinely remains unchanged.
Fixed quotations tend to make more sense for clearly specified larger projects.
For homeowners, the safest approach is usually to compare detailed written quotations rather than simply asking:
“What’s your day rate?”
Our guide to how to compare quotes properly explains why two prices can look similar while covering very different work.
How Much Does a Bricklayer Charge Per Day?
Current 2026 figures put a typical bricklayer around £240–£320 per day.
Bricklayers may be needed for:
- extensions;
- garden walls;
- structural openings;
- brick repairs;
- new-build work.
Be careful when comparing bricklaying day rates with prices per brick or per square metre, because these are different pricing models.
A bricklayer may also work with a labourer.
If the bricklayer costs £300 per day and a labourer costs £150:
£300 + £150 = £450 per day
before materials.
For a five-day job:
£450 × 5 = £2,250 labour
This illustrates why team composition matters when comparing quotations.
How Much Does a Labourer Cost Per Day?
Current figures are broad.
Checkatrade puts labourers around £112–£280 per day, while MyBuilder gives a wider 2026 range extending to approximately £360 depending on work and location.
A labourer may:
- move materials;
- mix mortar;
- clear waste;
- prepare work areas;
- assist skilled trades;
- keep materials flowing.
Hiring a labourer can actually reduce the total project cost in some cases.
A skilled builder charging £350 per day should not necessarily spend hours carrying rubble or mixing every batch of mortar if a lower-cost labourer can do that while the builder continues the skilled work.
How Much Does a Carpenter Charge Per Day?
Current MyBuilder 2026 figures put carpenters around £240–£360 per day.
Carpenters might be involved in:
- roof structures;
- stud walls;
- joists;
- floors;
- doors;
- timber framing;
- first and second fix work.
A general builder may carry out some carpentry themselves, but more specialist work can require a dedicated carpenter.
If your builder says another trade is needed, ask whether that cost is:
included in the quote
or
added separately.
How Much Does a Plasterer Charge Per Day?
Current 2026 market guidance puts plasterers at roughly £250–£350 per day.
Plastering often appears towards the end of structural building work.
For example, removing a wall may involve:
- builder;
- structural engineer;
- steel installation;
- electrician;
- plasterer;
- decorator.
This is why the builder’s own day rate can represent only one component of the total job.
How Much Does a Roofer Charge Per Day?
Current Checkatrade figures put roofers at around £280–£360 per day.
Roof work may also require scaffolding, which Checkatrade currently prices around £280–£320 per day for scaffolder labour in its trade-rate comparison.
This explains why a relatively small roof repair can cost much more than the few tiles being replaced might suggest.
Safe access can represent a significant proportion of the total.
Why Are Builder Day Rates So Different?
There are several legitimate reasons.
Experience
A builder who has handled structural renovations for 20 years may reasonably charge more than someone relatively new to the trade.
Experience can also reduce costly mistakes.
Type of work
Building a simple garden wall is not the same as altering the structure of a Victorian house.
Higher-risk or more specialised work can justify a higher rate.
Location
Builder rates tend to be higher in London and the South East.
MyBuilder says London and the South East can sit roughly 20–40% above national averages, while its current regional data gives example day rates of around £233 in London, £196 in Manchester, £194 in Birmingham and £188 in Cardiff.
These figures are only indicative, but they show the geographic difference.
Business structure
A sole trader may have lower overheads.
A larger company may have:
- office staff;
- project managers;
- multiple vehicles;
- employees;
- higher insurance costs.
That can increase the rate.
Demand
A good builder booked six months ahead does not need to price aggressively to fill their diary.
High demand can push rates upward.
Tools and equipment
Builders provide expensive equipment that must be:
- bought;
- maintained;
- replaced;
- insured.
The day rate needs to contribute towards those costs.
Is £400 a Day Expensive for a Builder?
Not necessarily.
At current 2026 rates, £400 is around the national headline benchmark used by Checkatrade for a builder.
But the number means little without knowing what you are getting.
Suppose Builder A charges:
£300/day
and needs:
10 days
Labour:
£3,000
Builder B charges:
£400/day
and completes equivalent work in:
7 days
Labour:
£2,800
The supposedly expensive builder is actually cheaper.
Speed alone is not enough either.
Quality, planning, supervision and whether the work needs correcting afterwards matter.
That is why the lowest day rate should never be the sole reason you hire someone.
Why the Cheapest Builder Can Cost More
Imagine three quotes:
Builder A: £250/day
Builder B: £325/day
Builder C: £400/day
Builder A looks dramatically cheaper.
But then:
- the job takes longer;
- waste costs extra;
- materials collection is charged separately;
- mistakes require rework;
- another trade is needed unexpectedly.
The final bill can exceed Builder B or C.
This is exactly why you should compare builder quotes properly rather than automatically choosing the cheapest.
Ask each builder to price the same scope.
Only then is the comparison meaningful.
What Should Be Included in a Builder’s Quote?
For anything more substantial than a very small repair, you should expect a written quotation.
It should ideally make clear:
- exact work included;
- labour;
- materials;
- subcontractors;
- waste removal;
- scaffolding;
- equipment hire;
- VAT where applicable;
- payment schedule;
- expected timescale;
- exclusions;
- how variations are handled.
Our written quote checklist explains the information worth checking before agreeing to building work.
A quote saying:
Extension: £48,000
is far less useful than one breaking down the specification, materials, stages and exclusions.
Are Materials Included in a Builder’s Day Rate?
Usually not automatically.
A day rate normally refers to labour.
Materials may be:
- purchased by you;
- purchased by the builder and recharged;
- included in a separate fixed quotation.
MyBuilder explicitly describes the day rate as primarily labour-only unless otherwise agreed.
Always establish this beforehand.
If the builder charges £350 per day and then supplies £500 of materials, your bill is not £350.
It is:
£350 labour + £500 materials = £850
plus any VAT or other costs where applicable.
Does the Day Rate Include VAT?
Not necessarily.
If the contractor is VAT registered, VAT may apply to the quoted amount.
Always ask whether the stated figure is:
£400 including VAT
or
£400 + VAT
At 20% VAT, the difference is:
£400 × 1.20 = £480
Across ten days:
£4,000 becomes £4,800
That is a large budgeting difference.
A written quote should make the VAT position clear.
Does a Builder Charge for Travelling?
Usually local travel is incorporated into the rate or project price, but this varies.
You may pay more where:
- the property is far from the builder’s normal area;
- parking is expensive;
- congestion charges apply;
- materials require significant additional collection.
London projects in particular can incur substantial parking and access costs.
Ask whether travel and parking are included before work starts.
Do Builders Charge for Collecting Materials?
Some do.
A builder spending two hours collecting materials is still using working time.
Different businesses handle this differently:
- incorporated into day rate;
- materials delivery used instead;
- collection time charged;
- included within fixed quotation.
For larger projects, professionally scheduled deliveries are often more efficient than repeatedly sending skilled builders to merchants.
If the quotation is fixed, you usually care more about the final agreed price than individual collection hours.
How Many Hours Is a Builder’s Day?
There is no universal definition.
MyBuilder describes a typical builder day rate as usually covering approximately an eight-hour working day, but real working schedules vary.
A builder might work:
8:00am–4:30pm
with breaks.
Another may start earlier or finish later.
The more important question is what progress is expected and whether the agreed rate applies to a normal full working day.
If you are paying a day rate, establish working arrangements before the project begins rather than arguing about hours afterwards.
Should You Pay a Builder by the Day?
For small or uncertain work, it can make sense.
For example, imagine you have an old property with several areas requiring investigation and repair.
The builder cannot know exactly what is behind the damaged plaster until it is removed.
A day rate allows work to proceed without pretending the final scope is known.
For a clearly defined £70,000 extension, however, you probably want a detailed project quotation rather than an open-ended:
£400 per day until we’re finished.
The larger the project, the more valuable price and scope certainty becomes.
When Is an Hourly Rate Better?
Hourly rates work well for genuinely small jobs.
Suppose a repair needs approximately three hours.
At £45 per hour:
3 × £45 = £135
Charging a full £350–£400 day would be excessive unless the builder could not realistically schedule other work around it or a minimum charge applied.
Ask for the expected time before agreeing.
When Is a Fixed Project Price Better?
Fixed pricing is particularly useful for:
- extensions;
- conversions;
- renovations;
- kitchens;
- structural alterations;
- significant refurbishments.
These projects involve enough moving parts that a simple builder day rate tells you almost nothing about the final cost.
A full project quote creates much stronger cost control.
But only if the scope is detailed.
“Build extension” is not detailed enough.
How Much Would a Builder Cost for a Week?
At £400 per day and a five-day working week:
£400 × 5 = £2,000
At £300 per day:
£300 × 5 = £1,500
At £250 per day:
£250 × 5 = £1,250
This is labour only if nothing else is included.
A builder plus labourer might instead cost:
Builder: £350 × 5 = £1,750
Labourer: £180 × 5 = £900
Total labour: £2,650
That is before materials.
How Much Would a Builder Cost for a Month?
A four-week project with one builder working five days per week gives approximately 20 working days.
At £300:
£6,000
At £350:
£7,000
At £400:
£8,000
But larger building projects rarely involve one identical builder working alone every day.
Some days may involve:
- bricklayer;
- electrician;
- plumber;
- labourers;
- carpenter;
- plasterer.
So calculating a renovation by multiplying one builder’s rate by the project duration can substantially underestimate the real labour cost.
Should You Negotiate a Builder’s Day Rate?
You can discuss the price.
But negotiating purely for the sake of lowering the day rate may be counterproductive.
A better conversation is:
Can the work be quoted as a fixed project?
Can I supply certain materials?
Can related jobs be completed together?
Are there any elements I can remove from the scope?
Can waste disposal be handled differently?
That changes the project cost rather than demanding the same work for less money.
A builder who has quoted correctly has to pay their own business costs too.
How to Tell Whether a Builder’s Rate Is Fair
Get multiple quotations.
Then compare:
Scope
Are all builders pricing exactly the same work?
Materials
Do the specifications match?
Labour
Does the price cover one person or a team?
Waste
Is skip hire included?
Access
Is scaffolding included?
VAT
Are all quotes presented on the same basis?
Timescale
How long does each builder expect the job to take?
Experience
Have they completed similar projects?
The cheapest number is only useful if everything else is equal.
It rarely is.
Don’t Hire a Builder on Price Alone
Construction work can affect the structure, safety, weather protection and value of your home.
For substantial jobs, checking the builder properly is worth the effort.
Look at:
- relevant experience;
- previous similar projects;
- genuine reviews;
- insurance;
- written quotation;
- payment terms;
- communication;
- business details;
- references where appropriate.
Our guide to choosing a trustworthy builder covers the checks worth making before committing to a major project.
Be particularly cautious about selecting somebody solely because they can start tomorrow when every other reputable local builder is booked for months.
Availability alone is not proof of a problem, but it is worth understanding why.
Watch Out for Very Large Upfront Payments
Builders may legitimately require deposits or stage payments, particularly where expensive materials must be ordered.
But homeowners should understand what they are paying for.
A sensible payment structure might correspond with:
- deposit;
- materials;
- foundation completion;
- structural stage;
- roof/weather-tight stage;
- finishing;
- final completion.
Avoid vague arrangements where most of the project price is handed over before meaningful work has happened without a clear contractual reason.
For large projects, put the payment schedule in writing.
Changes During the Job Need Pricing Too
Building projects often change.
You decide to add:
- another doorway;
- upgraded flooring;
- extra sockets;
- a rooflight.
That is a variation.
The safest approach is to agree the price impact before the additional work is carried out wherever practical.
Otherwise the final invoice can contain unexpected extras and neither side has a clear record of what was agreed.
Likewise, genuinely unforeseen conditions can change the cost.
A builder cannot necessarily be expected to include repairing hidden rotten timber in a quote where nobody could see it before opening the structure.
Clear communication matters.
Does a Higher Day Rate Mean Better Quality?
No.
Price alone does not prove competence.
A £450-per-day builder can do poor work.
A £250-per-day builder can be excellent.
Day rate is simply one piece of information.
Look at:
quality + experience + speed + scope + reliability + total project price
rather than assuming expensive equals good or cheap equals bad.
Frequently Asked Questions
How much does a builder charge per day in the UK?
A general builder typically charges around £200–£400 per day in 2026, with Checkatrade currently using around £400 per day as its headline national average.
How much does a self-employed builder charge per day?
There is no single rate, but current guidance puts self-employed builder labour around £40 per hour, which can translate to roughly £300+ for a normal working day depending on how the builder prices their work.
How much does a builder charge per hour?
Approximately £25–£60 per hour is a useful broad range, with experienced builders often around £40–£50 per hour.
How much does a bricklayer charge per day?
Current UK guidance is approximately £240–£320 per day.
How much does a builder cost for a week?
At £300–£400 per day over five days, around £1,500–£2,000 for one builder’s labour is a useful calculation.
Materials and other trades can increase the total substantially.
Is £400 a day reasonable for a builder?
Yes, it can be. Checkatrade currently uses around £400 per day as a national 2026 benchmark for general builders.
Whether it represents good value depends on the work, experience, location and how efficiently the project is completed.
Are materials included in a builder’s day rate?
Usually not unless explicitly agreed. A day rate generally represents labour, while materials and specialist trades are commonly separate.
Is VAT included in builder day rates?
Not automatically.
If the builder or company is VAT registered, check whether the quoted price includes VAT or whether it will be added.
Should I choose the builder with the lowest day rate?
No.
Compare the total expected cost, work included, quality, timescale, experience and any exclusions.
A lower daily price can cost more overall if the job takes longer or important elements are excluded.
Is it better to pay a day rate or fixed price?
Day rates can make sense for uncertain or small-scale work.
Fixed quotations generally give homeowners more cost certainty for clearly specified larger projects.
So, How Much Should You Budget for a Builder?
For a general builder in the UK in 2026, a realistic budgeting range is approximately:
£200–£400 per day
with around £400 per day currently appearing as a prominent national benchmark.
For hourly work, expect approximately:
£25–£60 per hour
with experienced builders often charging around £40–£50 per hour.
Other skilled trades commonly sit around:
Bricklayer: £240–£320/day
Carpenter: £240–£360/day
Plasterer: £250–£350/day
Roofer: £280–£360/day
Electrician: £300–£480/day
Plumber: £320–£480/day.
But do not use the builder’s day rate as the main way of comparing large projects.
If you are spending £10,000, £30,000 or £100,000 on building work, the detail of the quotation matters far more than whether one builder charges £325 per day and another charges £375.
Get the scope in writing, compare quotations on the same basis and check who you are hiring before paying substantial sums.
If you need professional help for building or renovation work, The Right Guy can help you discover local builders and other service professionals. When requesting quotes, provide as much detail as possible about the project so businesses are pricing the same job — and you can compare the actual value rather than just the headline day rate.